When implementing which of the following operations, manual rollout can be used after landing?
A.CAT IIIa B.CAT III a, CAT IIIb C.CAT IIIa, CAT IIIb, CAT IIIc D.None of the above正确答案A
When implementing which of the following operations, manual rollout can be used after landing?
A.CAT IIIa B.CAT III a, CAT IIIb C.CAT IIIa, CAT IIIb, CAT IIIc D.None of the above正确答案A