Assuming a failure occurs above 1000 ft RA, all ECAM actions (including correction of DH as required) must be completed before reaching the radio altitude of 1000 ft RA, or go around will be carried out.
A.Correct B.Incorrect正确答案A
Assuming a failure occurs above 1000 ft RA, all ECAM actions (including correction of DH as required) must be completed before reaching the radio altitude of 1000 ft RA, or go around will be carried out.
A.Correct B.Incorrect正确答案A