The factory was awarded the contract for the ______ with supplied drawings.
A.processing Gear Boxes B.processings of Gear Boxes C.processing of Gear Boxes D.process of Gear Boxes正确答案C
The factory was awarded the contract for the ______ with supplied drawings.
A.processing Gear Boxes B.processings of Gear Boxes C.processing of Gear Boxes D.process of Gear Boxes正确答案C